GCF GENERALE COSTRUZIONI FERROVIARIEÂ has chosen the POWERVE system for its operations.
The Roman company has four Italian offices and seven foreign branches. It became an model, capable of offering very high standards of productivity, safety, quality (in all railway and underground construction sites), renovation and rehabilitation, maintenance, electric traction and railway signaling.
After the purchase of the measuring system, two days ago the IVM staff carried out a training activity for the correct use of POWERVE, in agreement with the customer.
In particular, GCF – Generali Costruzioni Ferroviarie has chosen the POW4X configuration of the system which allows to measure 4 wheelsets at the same time in order to guarantee the correct equalization of the loads per wheel and reduce the risk of derailment at low speed.